Project Summary

To Develop Gadgets with the Help of Electronics or Instrumentation Along with Mechanical Components to form a Product as a Whole that Will help in Integrating a Sports Portal in the Long Run with the Recording of Important Clips for Umpiring and Descision Making by Using IOT and Database and Web Integration.

Key Words

Product Design, Sports, Table Tennis, Badmington, Concentration

Introduction

To Identify and Document Different Indoor Games that need to be Developed With Enough Database Support along with IOT and Web Integration.

Origin Of Proposal

By Practice and Observation of Different Games Played by Players and Organised by Organisers.

Problem Definition

We have found that there are still Unwanted Practices followed by Some Organisers and Foul play possibilities. This Project is an Attempt to Avoid such problems.

Work plan

Design of the Gadget, Develop a Prototype and Test the Equipment With Software as Well.

Project Information

Title: SPORTS GADGETS
Trade Name: Aurom SPO
Area: Use of Technology In Sports
Expected Duration In Months for Stabilisation: 36
Estimated Initial Budget for First Rollout: 24 Crores
Life Cycle: As Long as Human Beings take part in Sports and Games
Website: Click here
Share Project:

Review and Status of Research and Development in the Subject

We are yet to come across Companies that Offer Ened to End Solutions in this Field for Sports and Games Especially Indoor.

Drawings Yet To Be Designed

Drawings Yet To Be Designed

Share Project:

Time Schedule of Work Plan

Sl No Broad Work Element Time Estimates In Months
1 Formulation of Functonal Outputs desired for the Gadget 3
2 Collecting data for different materials suitable for the Equipment 2
3 Deciding on the Initial Part List or Bill of Materials 1
4 Design the Gadget 6
5 Review of the Gadget Design 1
6 Procure materials with due enquiry and a formal Purchase Order 1
7 Manufacture the Gadget as per the Design Specifications 2
8 Assemble the Gadget 1
9 Test the Gadget on a test bench by Simulation or by actual people Playing. 6
10 Design review and corrections to suit any changes sought if found absolutely necessary 3
11 Calibrate the standard readings with the help of a proper standards. 4
12 Rearrangements and adjustments and actual tests on different users at different locations 2

Minimum Group Organisation

Sl No Group Code Position Description No Of Posts
1 36 Design Engineer Mechanical 1
2 35 Accountants 1
3 37 Purchase Officer 1
4 38 Staff Assistant 2
5 31 Marketing Managers 2
6 23 Internal Project Manager 1
Share Project:

Suggested plan of action for utilization of Research Outcome Expected from the project

We will have to Workout a plan to tie up with Major Coaching Centers in India for Indoor Sports to Start With and Extend them with Time according to the Progress made in Our Product Developments.

Budget Estimates: Summary

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
A. Recurring
Salary Expenses 10860000 11946000 13140600 35946600
Printing and Stationery 300000 330000 363000 993000
Travelling Expenses 1200000 1320000 1452000 3972000
Others 30000000 33000000 36300000 99300000
B. Equipment To be Built If Applicable 50000000 25000000 20000000 95000000
Grand Total (A+B) 92360000 71596000 71255600 235211600

Budget for Salaries/Wages

Position Description No Of Posts Monthly Emoluments BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Design Engineer Mechanical 1 125000 1500000 1650000 1815000 4965000
Accountants 1 125000 1500000 1650000 1815000 4965000
Purchase Officer 1 125000 1500000 1650000 1815000 4965000
Staff Assistant 2 40000 960000 1056000 1161600 3177600
Marketing Managers 2 100000 2400000 2640000 2904000 7944000
Internal Project Manager 1 250000 3000000 3300000 3630000 9930000
Totals 10860000 11946000 13140600 35946600

Budget for Consumable Materials

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Printing and Stationery 300000 330000 363000 993000

Budget for Travelling Expences

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Travelling Expenses 1200000 1320000 1815000 4335000

Budget for Other Expenditures

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Others 30000000 33000000 36300000 99300000

Budget for Equipment If Applicable

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Equipment To be Built If Applicable 50000000 25000000 20000000 95000000

Infrastructural Facilities

SrNo Infrastructural Facility Status
1 Workshop Facility Yes – Sharing basis
2 Water & Electricity Yes - Sharing basis
3 Laboratory Space/ Furniture Yes - Sharing basis
4 Power Generator No
5 AC Room or AC No
6 Air Cooler If Tempratures are too High Yes
7 Telecommunication including e-mail & fax Yes
8 Transportation Yes
9 Administrative/ Secretarial support Yes – Sharing Basis
10 Information facilities like Internet/ Library Yes – Sharing Basis
11 Computational facilities Yes – Sharing Basis
12 Animal/ Glass House No
13 Any other special facility being provided Not Required

Equipment available with the Institute/ Group/ Department/ Other Institutes for the project

Sl No Equipment Available Generic Name Of Equipment Qty Available Model Make And Year Of Purchase Remarks Including Accessories Available And Current Usage Of Equipment
1 With Group Laptops 1 2016-2016 60% capacity utilisation
2 With Group Laptops 1 2016-2016 60% capacity utilisation
3 With Group Laptops 1 2016-2016 60% capacity utilisation
4 With Group Major CNC Turning Center 1 Major 1000 - 2014 40% capacity utilisation
5 With Group MIG welding equipment 1 Mogora – 2018 60% capacity utilisation
6 With Group Drilling Machine 1 Local – 1996 20% capacity utilisation
7 With Group Cutting Machine 1 Local – 2000 25% capacity utilisation