REPORT DESIGNER

Project Summary

To Develop a Designer for Generating Reports from A Data Base Server With or Without Parameters.

Key Words

Report Designer, Reports, HTML Reports, Entity Relationship Diagram, Enterprise Resource Planning, Low Code, Code Automator, SDLC, Software Development Life Cycle

Introduction

Data Reporting Happens to be an Important Part of any Application. Although These Days most Applications Aim at Descision Support Systems at Various Levels Still Reporting Happens to be a Mandatory Especially at Government Departments. Hence Report Designer is a Tool that Helps a Developer to Quickly Configure the Reports.

Origin Of Proposal

These days an kind of a minimum accepted requirements of Application Software Demands that it should be Online that is it must be Web Based. Often we find delays in Choosing the Right Reporting Tool as Usually It is not a Common Addendum with a Standard IDE.

Problem Definition

Not Many Ready Tools are Available on a Database Server that Will Allow an User To Integrate them Seamlessly with the Front End. We are Planning to Have an Integrated and Amalgmated Solution to Solve the Problem from the Database to the Front End on the Web without an Extra Liscence as far as possible.

Work plan

The Idea is to allow the Developer to Access the Table or a Stored Procedure with or without Parameters that will give A Direct or a Derived or a Calculated Data Field as Output That Needs to be Interpreted without Repetitions in Different Sections of a Report.

Project Information

Title: REPORT DESIGNER
Trade Name: Aurom RD
Area: Research In Software Architecture & Design
Expected Duration In Months for Stabilisation: 18
Estimated Initial Budget for First Rollout: 25 Crores
Life Cycle: As Long as Computers are Used for Applciation Develeopment and Use
Website: Click here
Share Project:

Review and Status of Research and Development in the Subject

We will try and see if we can Invite National Informatics Center, Software Technology Parks of India, apart from Educational Institutions, Corporate Bodies and Related Organisations must take an Active Part in Reviewing the Project if they think they have the time and a Constructive Approach to decide in a Time Bound Schedule.

Project Features / Product Catalog

Point the Data Source

  • It is Important to First Point Out the Data Source.

Choose Data Access Type

  • Specify weather you will be Gathering the Data From a Table or a Stored Procedure Or Some Other Source that Can Be Read.

Choose Page

  • Next Step is to Choose a Standard Page Size and Layout of the Page On the Printer.

Configure

  • From this point Onwards we are Planning to Automate the Process of Defining the Parameters Along With the Data Types that Need to be Assigned to the Data Fields that the Database Server Returns after Executing the Query Till they are Configured with Respective Headers and Fields That Need to be Printed in the Report.

Near Future Mandatory Necessary Enhancements Planned

1. Connectivity to a preferred DB Server.
2. A Diagramming Support with preferred pointers to the Underlying Columns Returned.
3. A report Previewer.

Share Project:

Sample Entity Relationship Diagram

Sample Entity Relationship Diagram

Share Project:

Time Schedule of Work Plan

Sl No Broad Work Element Time Estimates In Months
1 A way to get Data Access Objects that need to be Assigned to the Column Names Returned by the Query from Database. 2
2 A Simple Visualiser to Get All the Data Fields, Names and their Data Types. 3
3 A Drag and Drop Attachment to Place the Fields on the Report Designer. 2
4 A Previewer to See Some Sample Data on the Report Preferably. 3
5 Processed information can then be Acutually Printed on Different Printers. 2

Minimum Group Organisation

Sl No Group Code Position Description No Of Posts
1 1 Testing Administrator 1
2 2 Assistant DB Architect 4
3 3 Internal User Interface Administrator 1
4 4 Data Mapper Administrator 2
5 5 Process Experts 2
6 6 Programmers 10
7 7 Accountants 1
8 8 Process Designers 2
9 9 Internal Marketing Administrator 1
10 10 Internal Project Manager 1
Share Project:

Suggested plan of action for utilization of Research Outcome Expected from the project

We are planning to Tie Up with Ramakrishna Mission Vivekananda Educational and Research Institute http://rkmvu.ac.in/ so that they can maintain the Entire Design, Source Code and Related Documentation necessary for it to Survive and Grow or Tie up with Microsoft Corporation / Microsoft Foundation so that A Team can be formed to Ensure that these Services and Upgrades are available to All Organisations in India freely to Develop and Enhance but not to Voilate the Set Statuatory and Predefined Standards.

Budget Estimates: Summary

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
A. Recurring
Salary Expenses 67500000 74250000 81675000 223425000
Printing and Stationery 300000 330000 363000 993000
Travelling Expenses 2400000 2640000 2904000 7944000
Others 2400000 2640000 2904000 7944000
B. Equipment To be Built If Applicable 0 0 0 0
Grand Total (A+B) 72600000 79860000 87846000 240306000

Budget for Salaries/Wages

Position Description No Of Posts Monthly Emoluments BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Testing Administrator 1 250000 3000000 3300000 3630000 9930000
Assistant DB Architect 4 250000 12000000 13200000 14520000 39720000
Internal User Interface Administrator 1 250000 3000000 3300000 3630000 9930000
Data Mapper Administrator 2 250000 6000000 6600000 7260000 19860000
Process Experts 2 250000 6000000 6600000 7260000 19860000
Programmers 10 200000 24000000 26400000 29040000 79440000
Accountants 1 125000 1500000 1650000 1815000 4965000
Process Designers 2 250000 6000000 6600000 7260000 19860000
Internal Marketing Administrator 1 250000 3000000 3300000 3630000 9930000
Internal Project Manager 1 250000 3000000 3300000 3630000 9930000
Totals 67500000 74250000 81675000 223425000

Budget for Consumable Materials

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Printing and Stationery 300000 330000 363000 993000

Budget for Travelling Expences

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Travelling Expenses 2400000 2640000 3630000 8670000

Budget for Other Expenditures

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Others 2400000 2640000 2904000 7944000

Budget for Equipment If Applicable

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Equipment To be Built If Applicable 0 0 0 0

Infrastructural Facilities

SrNo Infrastructural Facility Status
1 Workshop Facility Yes – Sharing basis
2 Water & Electricity Yes - Sharing basis
3 Laboratory Space/ Furniture Yes - Sharing basis
4 Power Generator No
5 AC Room or AC No
6 Air Cooler If Tempratures are too High Yes
7 Telecommunication including e-mail & fax Yes
8 Transportation Yes
9 Administrative/ Secretarial support Yes – Sharing Basis
10 Information facilities like Internet/ Library Yes – Sharing Basis
11 Computational facilities Yes – Sharing Basis
12 Animal/ Glass House No
13 Any other special facility being provided Not Required

Equipment available with the Institute/ Group/ Department/ Other Institutes for the project

Sl No Equipment Available Generic Name Of Equipment Qty Available Model Make And Year Of Purchase Remarks Including Accessories Available And Current Usage Of Equipment
1 With Group Laptops 1 2016-2016 60% capacity utilisation
2 With Group Laptops 1 2016-2016 60% capacity utilisation
3 With Group Laptops 1 2016-2016 60% capacity utilisation
Contact Us

Send your message

Mail Integraton Under Progress, Please mail us directly to director@auromindia.org