IDLER SEALS

Project Summary

To Design and Develop Rubber Seals for Sealing the Idlers that are Used In Large Quantities in Belt Conveyors for Bulk Material Handling.

Key Words

Seals, Product Design, Process Design, Idlers, Belt Conveyors

Introduction

Idlers are Extensively Used In Belt Conveyors and Often Fail to give a Desent leave alone A Full Life Span before thay are Replaced. Many a Times The Reason for Replacement is Faulty Manufacture of the Seals that are Used Although they are Manufactured as per the Standards Especially in India.

Origin Of Proposal

A large Amount of Resources are Spent in Keeping the Belt Conveyors in Running Condition In Process Oriented Industries and Failure of Idelrs Is A Matter of Concern to any Maintenance Department Head.

Problem Definition

To Develop a Fool Proof Design for An Idler Seal So that the Idlers do not Need any Testing for Water Penetration and Dust Penetration Tests on Special Testing Machines that are Mandatory at present as per Indian Standards.

Work plan

Designing Seals for Different Bearing Sizes.

Project Information

Title: IDLER SEALS
Trade Name: Aurom IDSD
Area: Innovation In Product Design
Expected Duration In Months for Stabilisation: 18
Estimated Initial Budget for First Rollout: 24 Crores
Life Cycle: As Long as Process Industries are a Part of this Planet Earth
Website: Click here
Share Project:

Review and Status of Research and Development in the Subject

We will try and see if we can Invite Bureau of Indian Standards (BIS), apart from Educational Institutions, Corporate Bodies and Related Organisations must take an Active Part in Reviewing the Project if they think they have the time and a Constructive Approach to decide in a Time Bound Schedule.

Sample Drawings

Sample Drawings

Share Project:

Time Schedule of Work Plan

Sl No Broad Work Element Time Estimates In Months
1 Designing Seals for 6204 Bearing 2
2 Choosing a suitable Rubber Material preferably Neoprene Rubber 2
3 Designing Molds for Rubber Molding of Seals 2
4 Testing of this for Batch Production. 3
5 Machines choosen must have Electronic controls for safety and Automation within permissible levels so that employment also is available and can be scaled. We can have an advanced mechanism for Automation that is disabled so that employment oppourtunity is generated in thickly populated areas and Automation in used if absolutely necessary. 2
6 Repeate the same for 6205 and 6206 Bearing Sizes 4

Minimum Group Organisation

Sl No Group Code Position Description No Of Posts
1 36 Design Engineer Mechanical 1
2 35 Accountants 1
3 37 Purchase Officer 1
4 38 Staff Assistant 2
5 31 Marketing Managers 2
6 23 Internal Project Manager 1
Share Project:

Suggested plan of action for utilization of Research Outcome Expected from the project

We are planning to Tie Up with Ramakrishna Mission Vivekananda Educational and Research Institute http://rkmvu.ac.in/ so that they can maintain the Entire Design, Source Code and Related Documentation necessary for it to Survive and Grow or Tie up with Microsoft Corporation / Microsoft Foundation so that A Team can be formed to Ensure that these Services and Upgrades are available to All Organisations in India freely to Develop and Enhance but not to Voilate the Set Statuatory and Predefined Standards.

Budget Estimates: Summary

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
A. Recurring
Salary Expenses 10860000 11946000 13140600 35946600
Printing and Stationery 300000 330000 363000 993000
Travelling Expenses 1200000 1320000 1452000 3972000
Others 30000000 33000000 36300000 99300000
B. Equipment To be Built If Applicable 50000000 25000000 20000000 95000000
Grand Total (A+B) 92360000 71596000 71255600 235211600

Budget for Salaries/Wages

Position Description No Of Posts Monthly Emoluments BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Design Engineer Mechanical 1 125000 1500000 1650000 1815000 4965000
Accountants 1 125000 1500000 1650000 1815000 4965000
Purchase Officer 1 125000 1500000 1650000 1815000 4965000
Staff Assistant 2 40000 960000 1056000 1161600 3177600
Marketing Managers 2 100000 2400000 2640000 2904000 7944000
Internal Project Manager 1 250000 3000000 3300000 3630000 9930000
Totals 10860000 11946000 13140600 35946600

Budget for Consumable Materials

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Printing and Stationery 300000 330000 363000 993000

Budget for Travelling Expences

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Travelling Expenses 1200000 1320000 1815000 4335000

Budget for Other Expenditures

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Others 30000000 33000000 36300000 99300000

Budget for Equipment If Applicable

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Equipment To be Built If Applicable 50000000 25000000 20000000 95000000

Infrastructural Facilities

SrNo Infrastructural Facility Status
1 Workshop Facility Yes – Sharing basis
2 Water & Electricity Yes - Sharing basis
3 Laboratory Space/ Furniture Yes - Sharing basis
4 Power Generator No
5 AC Room or AC No
6 Air Cooler If Tempratures are too High Yes
7 Telecommunication including e-mail & fax Yes
8 Transportation Yes
9 Administrative/ Secretarial support Yes – Sharing Basis
10 Information facilities like Internet/ Library Yes – Sharing Basis
11 Computational facilities Yes – Sharing Basis
12 Animal/ Glass House No
13 Any other special facility being provided Not Required

Equipment available with the Institute/ Group/ Department/ Other Institutes for the project

Sl No Equipment Available Generic Name Of Equipment Qty Available Model Make And Year Of Purchase Remarks Including Accessories Available And Current Usage Of Equipment
1 With Group Laptops 1 2016-2016 60% capacity utilisation
2 With Group Laptops 1 2016-2016 60% capacity utilisation
3 With Group Laptops 1 2016-2016 60% capacity utilisation
4 With Group Major CNC Turning Center 1 Major 1000 - 2014 40% capacity utilisation
5 With Group MIG welding equipment 1 Mogora – 2018 60% capacity utilisation
6 With Group Drilling Machine 1 Local – 1996 20% capacity utilisation
7 With Group Cutting Machine 1 Local – 2000 25% capacity utilisation
Contact Us