To Design and Develop A CNC Welding Machine for Frames that are Used In Large Quantities in Belt Conveyors for Bulk Material Handling.
Product Design, CNC, CNC Welding Machine, Idlers, Belt Conveyors
Idler Frames are Extensively Used In Belt Conveyors and Fail at Times to give a Desent leave alone A Full Life Span before thay are Replaced. Many a Times The Reason for Replacement is Faulty Welds on Frames Although they are Manufactured as per the Standards Especially in India.
A large Amount of Resources are Spent in Keeping the Belt Conveyors in Running Condition In Process Oriented Industries and Failure of Frames Is A Matter of Concern to any Maintenance Department Head.
To Develop a Fool Proof Design for A Idler Frame So that the Frames do not Need Extensive Testing that are Mandatory at present as per Indian Standards.
Designing CNC Welding Machine.
| Sl No | Broad Work Element | Time Estimates In Months |
| 1 | Concept Designing of 3-Axis CNC Welding Machine with Ball Screws with Stepper Motors | 2 |
| 2 | Design & Drawings for Mechanical Parts | 2 |
| 3 | Electrcal & Electronic Circuit Design | 2 |
| 4 | Swan Neck Design and Motor Assembly for Welding Torch Movement | 3 |
| 5 | Home Position Location Assembly | 1 |
| 6 | Emergency Stop Electrical Means | 1 |
| 7 | Emergency Stop Electronic Means | 1 |
| 8 | Emergency Stop Mechanical Means | 1 |
We are planning to Tie Up with Ramakrishna Mission Vivekananda Educational and Research Institute http://rkmvu.ac.in/ so that they can maintain the Entire Design, Source Code and Related Documentation necessary for it to Survive and Grow or Tie up with Microsoft Corporation / Microsoft Foundation so that A Team can be formed to Ensure that these Services and Upgrades are available to All Organisations in India freely to Develop and Enhance but not to Voilate the Set Statuatory and Predefined Standards.
| Item | BUDGET | (in Rupees) | |||
| 1st Year | 2nd Year | 3rd Year | Total | ||
| A. | Recurring | ||||
| Salary Expenses | 10860000 | 11946000 | 13140600 | 35946600 | |
| Printing and Stationery | 300000 | 330000 | 363000 | 993000 | |
| Travelling Expenses | 1200000 | 1320000 | 1452000 | 3972000 | |
| Others | 30000000 | 33000000 | 36300000 | 99300000 | |
| B. | Equipment To be Built If Applicable | 50000000 | 25000000 | 20000000 | 95000000 |
| Grand Total (A+B) | 92360000 | 71596000 | 71255600 | 235211600 |
| Position Description | No Of Posts | Monthly Emoluments | BUDGET | (in Rupees) | ||
| 1st Year | 2nd Year | 3rd Year | Total | |||
| Design Engineer Mechanical | 1 | 125000 | 1500000 | 1650000 | 1815000 | 4965000 |
| Accountants | 1 | 125000 | 1500000 | 1650000 | 1815000 | 4965000 |
| Purchase Officer | 1 | 125000 | 1500000 | 1650000 | 1815000 | 4965000 |
| Staff Assistant | 2 | 40000 | 960000 | 1056000 | 1161600 | 3177600 |
| Marketing Managers | 2 | 100000 | 2400000 | 2640000 | 2904000 | 7944000 |
| Internal Project Manager | 1 | 250000 | 3000000 | 3300000 | 3630000 | 9930000 |
| Totals | 10860000 | 11946000 | 13140600 | 35946600 |
| Item | BUDGET | (in Rupees) | ||
| 1st Year | 2nd Year | 3rd Year | Total | |
| Printing and Stationery | 300000 | 330000 | 363000 | 993000 |
| Item | BUDGET | (in Rupees) | ||
| 1st Year | 2nd Year | 3rd Year | Total | |
| Travelling Expenses | 1200000 | 1320000 | 1815000 | 4335000 |
| Item | BUDGET | (in Rupees) | ||
| 1st Year | 2nd Year | 3rd Year | Total | |
| Others | 30000000 | 33000000 | 36300000 | 99300000 |
| Item | BUDGET | (in Rupees) | ||
| 1st Year | 2nd Year | 3rd Year | Total | |
| Equipment To be Built If Applicable | 50000000 | 25000000 | 20000000 | 95000000 |
| SrNo | Infrastructural Facility | Status |
| 1 | Workshop Facility | Yes – Sharing basis |
| 2 | Water & Electricity | Yes - Sharing basis |
| 3 | Laboratory Space/ Furniture | Yes - Sharing basis |
| 4 | Power Generator | No |
| 5 | AC Room or AC | No |
| 6 | Air Cooler If Tempratures are too High | Yes |
| 7 | Telecommunication including e-mail & fax | Yes |
| 8 | Transportation | Yes |
| 9 | Administrative/ Secretarial support | Yes – Sharing Basis |
| 10 | Information facilities like Internet/ Library | Yes – Sharing Basis |
| 11 | Computational facilities | Yes – Sharing Basis |
| 12 | Animal/ Glass House | No |
| 13 | Any other special facility being provided | Not Required |
| Sl No | Equipment Available | Generic Name Of Equipment | Qty Available | Model Make And Year Of Purchase | Remarks Including Accessories Available And Current Usage Of Equipment |
| 1 | With Group | Laptops | 1 | 2016-2016 | 60% capacity utilisation |
| 2 | With Group | Laptops | 1 | 2016-2016 | 60% capacity utilisation |
| 3 | With Group | Laptops | 1 | 2016-2016 | 60% capacity utilisation |
| 4 | With Group | Major CNC Turning Center | 1 | Major 1000 - 2014 | 40% capacity utilisation |
| 5 | With Group | MIG welding equipment | 1 | Mogora – 2018 | 60% capacity utilisation |
| 6 | With Group | Drilling Machine | 1 | Local – 1996 | 20% capacity utilisation |
| 7 | With Group | Cutting Machine | 1 | Local – 2000 | 25% capacity utilisation |