CODE BUILDER

Project Summary

To Develop an Automated Coding Standard that can Generate Standard Codes right from Database CRUD Operations on the Back End to the Front End Files once the Data Base Architecture Is Finalised.

Key Words

Code Builder,Enterprise Resource Planning, Low Code, Code Automator, SDLC, Software Development Life Cycle

Introduction

We have always had this Idea of Generating entire minimum required Codes for an Application once the Database Architecture is finalised by the Architectand hence Code Builder has been evolving with us as a Manifested Brain Child of Aurom India that can Generate Stored Procedures, Models, Controllers, Area Registraton Files and necessary Views for MVC Technology Based on Factory Patterns.

Origin Of Proposal

These days an kind of a minimum accepted requirements of Application Software Demands that it should be Online that is it must be Web Based. Often we find delays in Interpreting Client Requirements Understood by Analysts and Deigned by Architects to give a Solution.

Problem Definition

To reduce the Time Estimates and Resources in Software Development Life Cycle Irrespective of Platform Choosen.

Work plan

We will be starting with MS SQL Server as a Database, C# as Code Behind language and MVC.net with HTML as the Front End to start with and Development on other Databases and other Languages at a later stage depending on the Demand and need of the Technology. Although we had Orginally Designed the platform for ASP.NET we have Successfully Migrated in coming out with a Base Version for MVC.

Project Information

Title: CODE BUILDER
Trade Name: Aurom CB
Area: Research In Software Architecture & Design
Expected Duration In Months for Stabilisation: 24
Estimated Initial Budget for First Rollout: 25 Crores
Life Cycle: As Long as Computers are Used for Applciation Develeopment and Use
Website: Click here
Share Project:

Review and Status of Research and Development in the Subject

We will try and see if we can Invite National Informatics Center, Software Technology Parks of India, apart from Educational Institutions, Corporate Bodies and Related Organisations must take an Active Part in Reviewing the Project if they think they have the time and a Constructive Approach to decide in a Time Bound Schedule.

Project Features / Product Catalog

Designed Tables Get Here

  • Define Your Table Structures by Queries With Constraints. Paste them on the Text area and then Click the Button to Generate them on the Data Base.

Generate Your Stored Procedures

  • Create All the Stored Procedures on the Server in the Database where your Tables Recide that are Necessary with Naming Conventions for CRUD Operations with Click of a Button.

Generate

  • Entire Project Models(It Creates Area Registration Files And Web Configuration Files) Needless to mention All Folders along with Naming Conventions are Created which you just need to Copy and Paste in the Areas Folder of your MVC Project and Include in the Project.

Generate

  • Controllers And Views For Entire Project. Needless to mention All Folders along with Naming Conventions are Created which you just need to Copy and Paste in the Areas Folder of your MVC Project and Include in the Project.

Near Future Mandatory Necessary Enhancements Planned

What Seems to be a problem we are trying to Solve the worst a Programmer’s Nightmare but an Architect’s Delight is aliasing of Repetitive Master Keys in the related tables that need to be named differently than ones specified in the Master. Once this is achieved we would like to call this as a Stable Release. Future Planned Releases that need to be worked out depending on availability of Resources are as follows
1. An Intelligent Basic Designer for managing the HTML Layout.
2. Choice of Controls like a Table in place of a Drop Down list, an Auto suggestion from the System to analyse the Designers intent that can over ridden by the End User.
3. We should try to provide the End User a choice of a Template of his own which as of now is not possible.
4. Advanced Child and Master Data Entry Screens with or without Images.
5. Inline Editing of Advanced Master Screens with choice of Text Boxes for Respective Controls.
6. A Process Designer with all the above Design Base Ingredients to form a Tool for PROCESS DESIGN for a Business Owner with some Basic Design Skills and Relational Concept Subtlety.

Share Project:

Sample Entity Relationship Diagram

Sample Entity Relationship Diagram

Share Project:

Time Schedule of Work Plan

Sl No Broad Work Element Time Estimates In Months
1 Laying out principles of Table Design with One Primary Key for each table Irrespective of Database Choosen. 2
2 Ensure that Code Builder utility checks the Keys and provides a report for the missing ones in the Schema. 3
3 Developing a Master Stored Procedure that will generate all the Stores Procedures for CRUD Operations methodically with proper naming conventions for all the tables in the Database. 2
4 Developing a Methodology to generate User Input Screens for all the Master Tables with a click of a button with grids for Display and Printing of master data if necessary. 3
5 Developing a mehodology to access the Database Layer with the User Input Screens with the help of a Code Behind File a term that is usually used that will have the code to access Data from Tables and change the same. 2
6 Allowing the Architect or the Designer to Identify the Master and Child Tables that will involve Primary and Foreign Key Constraints enabled. 1
7 Allowing the Designer to choose amongst the type of the Interface that the Code Builder Utility can offer as a UI suitable for Data Entry and subsequent generation of the Ui screens and Code Behind Files so that nearly an error free Code is generated ready for Data Entry. 2
8 Develop Teams that can Identify the layers that need to be developed so that Application Speed can remain constant irrespective of the growth of data in the Database. 1

Minimum Group Organisation

Sl No Group Code Position Description No Of Posts
1 1 Testing Administrator 1
2 2 Assistant DB Architect 4
3 3 Internal User Interface Administrator 1
4 4 Data Mapper Administrator 2
5 5 Process Experts 2
6 6 Programmers 10
7 7 Accountants 1
8 8 Process Designers 2
9 9 Internal Marketing Administrator 1
10 10 Internal Project Manager 1
Share Project:

Suggested plan of action for utilization of Research Outcome Expected from the project

We are planning to Tie Up with Ramakrishna Mission Vivekananda Educational and Research Institute http://rkmvu.ac.in/ so that they can maintain the Entire Design, Source Code and Related Documentation necessary for it to Survive and Grow or Tie up with Microsoft Corporation / Microsoft Foundation so that A Team can be formed to Ensure that these Services and Upgrades are available to All Organisations in India freely to Develop and Enhance but not to Voilate the Set Statuatory and Predefined Standards.

Budget Estimates: Summary

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
A. Recurring
Salary Expenses 67500000 74250000 81675000 223425000
Printing and Stationery 300000 330000 363000 993000
Travelling Expenses 2400000 2640000 2904000 7944000
Others 2400000 2640000 2904000 7944000
B. Equipment To be Built If Applicable 0 0 0 0
Grand Total (A+B) 72600000 79860000 87846000 240306000

Budget for Salaries/Wages

Position Description No Of Posts Monthly Emoluments BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Testing Administrator 1 250000 3000000 3300000 3630000 9930000
Assistant DB Architect 4 250000 12000000 13200000 14520000 39720000
Internal User Interface Administrator 1 250000 3000000 3300000 3630000 9930000
Data Mapper Administrator 2 250000 6000000 6600000 7260000 19860000
Process Experts 2 250000 6000000 6600000 7260000 19860000
Programmers 10 200000 24000000 26400000 29040000 79440000
Accountants 1 125000 1500000 1650000 1815000 4965000
Process Designers 2 250000 6000000 6600000 7260000 19860000
Internal Marketing Administrator 1 250000 3000000 3300000 3630000 9930000
Internal Project Manager 1 250000 3000000 3300000 3630000 9930000
Totals 67500000 74250000 81675000 223425000

Budget for Consumable Materials

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Printing and Stationery 300000 330000 363000 993000

Budget for Travelling Expences

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Travelling Expenses 2400000 2640000 3630000 8670000

Budget for Other Expenditures

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Others 2400000 2640000 2904000 7944000

Budget for Equipment If Applicable

Item BUDGET (in Rupees)
1st Year 2nd Year 3rd Year Total
Equipment To be Built If Applicable 0 0 0 0

Infrastructural Facilities

SrNo Infrastructural Facility Status
1 Workshop Facility Yes – Sharing basis
2 Water & Electricity Yes - Sharing basis
3 Laboratory Space/ Furniture Yes - Sharing basis
4 Power Generator No
5 AC Room or AC No
6 Air Cooler If Tempratures are too High Yes
7 Telecommunication including e-mail & fax Yes
8 Transportation Yes
9 Administrative/ Secretarial support Yes – Sharing Basis
10 Information facilities like Internet/ Library Yes – Sharing Basis
11 Computational facilities Yes – Sharing Basis
12 Animal/ Glass House No
13 Any other special facility being provided Not Required

Equipment available with the Institute/ Group/ Department/ Other Institutes for the project

Sl No Equipment Available Generic Name Of Equipment Qty Available Model Make And Year Of Purchase Remarks Including Accessories Available And Current Usage Of Equipment
1 With Group Laptops 1 2016-2016 60% capacity utilisation
2 With Group Laptops 1 2016-2016 60% capacity utilisation
3 With Group Laptops 1 2016-2016 60% capacity utilisation
Contact Us

Send your message